Debris Removal
Waterway Debris Removal - Result of Declared Incident
Big Slough Drainage District
<<RETURN

Restoring the pre-disaster carrying or storage capacity of engineered channels may be eligible; but only if the Applicant provides documentation to establish: 1) the pre-disaster capacity of the facility; and 2) that the Applicant maintains the facility on a regular schedule.The Applicant has not substantiated the pre-disaster capacity of the Facilities; or that they were regularly maintained.Debris removal from waterways that is necessary to eliminate the immediate threat to life; public health and safety; or improved property is eligible for PA funding. Removal of debris in a waterway that does not meet this criterion is not eligible; even if the debris is deposited by the incident.The Applicant has not substantiated through documentation that the work was required to eliminate an immediate threat to life; property or public health and safety.

Waterway Debris Removal, Result of Declared Incident
2023

HeadnotesRestoring the pre-disaster carrying or storage capacity of engineered channels may be eligible; but only if the Applicant provides documentation to establish: 1) the pre-disaster capacity of the facility; and 2) that the Applicant maintains the facility on a regular schedule.The Applicant has not substantiated the pre-disaster capacity of the Facilities; or that they were regularly maintained.Debris removal from waterways that is necessary to eliminate the immediate threat to life; public health and safety; or improved property is eligible for PA funding. Removal of debris in a waterway that does not meet this criterion is not eligible; even if the debris is deposited by the incident.The Applicant has not substantiated through documentation that the work was required to eliminate an immediate threat to life; property or public health and safety.Conclusion

<<Open FEMA PA Appeal Link