Insurance
Insurance
Lafourche Parish School Board
<<RETURN

According to 44 C.F.R. 206.204 and the PA Guide; Category B emergency protective measures are those necessary to eliminate or reduce an immediate threat to life; public health; or safety; and are generally completed within 6 months of the date of declaration for a major disaster. Per the PA Guide and Fact Sheet 9580.100; Mold Remediation; mold remediation performed in the immediate aftermath of a disaster may be eligible as emergency work under Category B.The mold remediation activities in PW 588; as performed; were consistent with FEMA policy requirements for Category B mold remediation activities and within the required six-month timeline for emergency work; i.e.; from September 4 to September 28; 2012. Thus; the mold remediation work in PW 588 is eligible as emergency work under Category B.

FEMA-4080
2019

FEMA Fact Sheet (FS) 9580.100; Mold RemediationPA Guide; at 32–33; 71; 74; and 83 HeadnotesAccording to 44 C.F.R. § 206.204 and the PA Guide; Category B emergency protective measures are those necessary to eliminate or reduce an immediate threat to life; public health; or safety; and are generally completed within 6 months of the date of declaration for a major disaster. Per the PA Guide and Fact Sheet 9580.100; Mold Remediation; mold remediation performed in the immediate aftermath of a disaster may be eligible as emergency work under Category B.The mold remediation activities in PW 588; as performed; were consistent with FEMA policy requirements for Category B mold remediation activities and within the required six-month timeline for emergency work; i.e.; from September 4 to September 28; 2012. Thus; the mold remediation work in PW 588 is eligible as emergency work under Category B.

<<Open FEMA PA Appeal Link