Pursuant to 44 C.F.R. 206.225 (a)(3)(i-ii); in order to be eligible; emergency protective measures must eliminate or lessen immediate threats to life; public health or safety; or eliminate or lessen immediate threats of significant additional damage to improved public or private property through measures which are cost effective.Not all of the pumping work the Applicant performed after the end of the incident period addressed an immediate threat.Pursuant to 44 C.F.R. 206.223; to be eligible for financial assistance an item of work must “[b]e required as the result of the emergency or major disaster event.Lake water levels above the emergency pump level immediately after the incident period were a result of the disaster due to their proximity in time to the disaster event.OMB Circular A-87 provides that allowable costs must meet the cost principles of being allocable to Federal awards and adequately documented.

Immediate Threat
2017

OMB Circular A-87 Att. A § (C)(1)(a) & (j)HeadnotesPursuant to 44 C.F.R. § 206.225 (a)(3)(i-ii); in order to be eligible; emergency protective measures must eliminate or lessen immediate threats to life; public health or safety; or eliminate or lessen immediate threats of significant additional damage to improved public or private property through measures which are cost effective.Not all of the pumping work the Applicant performed after the end of the incident period addressed an immediate threat.Pursuant to 44 C.F.R. § 206.223; to be eligible for financial assistance an item of work must “[b]e required as the result of the emergency or major disaster event.Lake water levels above the emergency pump level immediately after the incident period were a result of the disaster due to their proximity in time to the disaster event.OMB Circular A-87 provides that allowable costs must meet the cost principles of being allocable to Federal awards and adequately documented.

<<Open FEMA PA Appeal Link